Unified BMS + DCM for Indian Data Centers

One platform for your entire facility. Cooling, power, security, every rack.

RakuOps unifies Building Management (BMS) and Data Center Management (DCM) in a single platform. Our IoT hardware and software ship together: live PUE, cooling, power, fire, leak, and access monitoring with AI alerts that open tickets automatically.

INTEGRATED HARDWARE + SOFTWARE

One install. One platform. One team to call.

We survey your site, install BMS plus DCM sensors across cooling, power, fire, leak, and access, and bring it live on RakuOps in a 4 to 6 week deployment. No separate vendors, no two dashboards.

Live PUE & cooling efficiency
Rack-level temp & humidity
PDU & UPS load monitoring
Leak, fire & smoke detection
Access & door contact events
AI alerts to auto-tickets

START HERE

Book a 45-minute site walk. We assess your facility and send a fixed-scope proposal within 5 working days.

View pricing →

Mumbai · Bengaluru · Hyderabad · Chennai · NCR

Replacing a legacy BMS, retiring spreadsheets, or instrumenting a new build? We handle the survey, install, and integration end-to-end.

Fixed scope

Quote in 5 working days, no surprises

4 to 6 weeks

From contract signing to go-live

One vendor

Hardware, software, install, support

AMC included

Year 1 AMC bundled. Renewable from year 2

LIVE FROM YOUR FACILITY

One screen for cooling, power, security, and every rack.

Live PUE, rack temperatures, PDU load, cooling status, and access events. AI flags anomalies and opens tickets before your NOC notices.

RakuOps · DC-Mumbai-1 · Live
LIVE
PUE · 24h
1.42
▼ 0.04 vs yesterday
Critical Systems
23 / 24
1 alert · uptime 99.98%
Open Alerts
4
1 critical · 3 watch
CRAC Unit A-2 NORMAL
22.4°C 47% RH Cooling OK
Rack Row R-04 TEMP CRIT
31.4°C inlet 42% RH +5.2°C in 6m
PDU B-04 HIGH LOAD
38.6 kW 88% load ↑ Trending up
UPS B-1 ONLINE
42 min runtime 98% battery N+1 healthy
Live Alerts to Tickets Auto-generated
JUST NOW · CRITICAL

Rack Row R-04 inlet temp 31.4°C, threshold 27°C

→ TKT-4521 assigned · NOC L2
8m AGO · CAPACITY

PDU B-04 load 88%, breaker capacity watch

→ TKT-4520 queued · electrical
23m AGO · RESOLVED

Leak rope alert in CRAC plant room, resolved

✓ TKT-4519 closed · 11m TAT
47m AGO · RESOLVED

Access door cage-2 held open 6m, verified with NOC

✓ TKT-4518 closed · 7m TAT
BMS + DCM sensors, one install

Cooling, power, fire, leak, smoke, access, rack inlet temperature, humidity, PDU current. We supply, install, and commission.

Live PUE, uptime & SLAs

Track PUE, cooling efficiency, room conditions, and uptime against your SLA. Every minute, every cage, every shift.

AI alerts to auto-tickets

When a sensor crosses threshold or pattern, RakuOps opens a ticket, routes to the right team (electrical, HVAC, NOC), and tracks TAT.

FEATURES

Built for facility teams that own uptime

Not another spreadsheet, not another PowerBI dashboard. Built for facility, NOC, and electrical teams that own SLA, run rounds every shift, and cannot afford a missed step.

RakuOps: Kanban Board
All employees Today
Open
4

Fire panel weekly test

High
AM

Cold aisle humidity check

Normal
SK

CRAC C-3 filter check

Normal
VR

UPS B-1 monthly load test

Medium
PK
In Progress
3

CRAC C-2 belt inspection

Started 42 min ago

High
RS

Generator weekly run-up

Started 1h 10 min ago

Normal
AM
OVERDUE · 1h 20min

NOC shift handover, Row R-04

Medium
SK
In Review
2

Weekly TIA-942 inspection report

Awaiting supervisor sign-off

High
VR

PDU calibration log, B-04

Quality team reviewing

Normal
PK
Done
7
TAT: 38 min

Morning startup, Line 1

Completed 7:41 AM
RS
TAT: 1h 12 min

Forklift battery swap, Bay 3

Completed 9:05 AM
SK
TAT: 22 min

Packaging line QC check

Completed 10:18 AM
PK

Tasks & Work Orders

Create tasks or formal work orders, assign them to employees, set deadlines, attach files, and track completion in real time.

Assign to any employee
Priority levels and due dates
Attach photos, documents, media
Employee TAT tracked automatically

Checklists

Build structured checklists for every facility procedure: CRAC PMs, UPS load tests, fire panel checks, cage access reviews, shift handovers. Assign, complete, and audit-log them all.

Multi-step checklist builder
Required fields and sign-off steps
Full completion history logged
Assign per employee or role

Scheduled Tasks & Checklists

Set recurring schedules so your team's daily, weekly, and monthly routines run automatically. No manager needed to kick them off every time.

Daily, weekly, monthly, or custom schedules
Auto-assigned to designated employees
Missed task alerts to managers
Works for tasks and checklists both

Kanban Board with Employee TAT

See all work across your team on a visual board. Move cards across stages, see who's overloaded, and track how long each person takes to close tasks.

Drag-and-drop Kanban board
Per-employee TAT (turnaround time) metrics
Overdue and at-risk flagging
Filter by employee, date, or status
Folders & Organisation

Group tasks and checklists by project, team, or department.

Media Library

Attach documents, files, photos to any task or checklist step.

Roles & Permissions

Control who can create, edit, assign, and view work across your team.

AI Credits

Let AI draft checklists, summarise task history, and surface blockers.

Billed separately per use

SCHEDULED TASKS

Recurring work that runs itself.

Schedule CRAC weekly PMs, fire-panel monthly tests, UPS quarterly load tests, and daily walkthroughs once. RakuOps assigns and dispatches them to the right facility tech every shift.

Daily, weekly, or custom intervals

Works for both tasks and multi-step checklists.

Auto-assigned to the right facility tech

No supervisor action needed. It appears in their queue with the SOP.

Missed run alerts

Missed a CRAC PM or UPS test? The facility manager is notified before audit.

RakuOps: Scheduled Tasks

Recurring schedules 6 active

+ New Schedule

CRAC Weekly PM · Row R-04

Daily · 6:00 AM → Anil V. (HVAC)
Active
Last run: Today 6:02 AM ✓ Completed on time

UPS Quarterly Load Test

Weekly · Mon 9 AM → Electrical Team
Active
Next run: Monday 9:00 AM Last: 7 days ago

Hot-aisle handover, Row R-04

Daily · 2:00 PM → Shift Supervisor
Missed
⚠ Was due Today 2:00 PM. Manager notified
📋
Cage-04 Access Review · Pre-Shift
Step 3 of 7 · Meera D.
Confirm cage door interlocks armed & sealed
Cage-04 door held open 6m, no badge logged for entry
📷 cage04_door_open_06am.jpg Attached
"Night NOC did not log exit at 04:12, door propped open"
Auto-escalation triggered
A
Arjun T. (NOC Manager) notified via app & SMS
🧹
Ticket raised: Verify cage-04 audit log & close door before 7:00 AM
Instant Escalation

When a step fails,
the right person knows immediately

A failed step is not just a missed checkbox. RakuOps captures photo evidence, the operator's note, notifies the right manager instantly, and opens a corrective ticket, before your customer or auditor finds out.

  • Photo & technician note captured at the point of failure
  • NOC and facility manager alerted via app & SMS instantly
  • Corrective ticket raised, SLA timer started automatically
Employee Performance

Know who's fast, who's slow,
and who needs support

Every task and checklist is timestamped from assign to close. RakuOps automatically calculates turnaround time per employee, so you can have data-backed conversations instead of gut-feel ones.

  • Average TAT per employee, per task type
  • On-time vs late completion rate
  • Date-range filtering: daily, weekly, monthly
RakuOps: Employee Performance Report This Month

Tasks

247

On Time

81%

Avg TAT

1h 24m

Overdue

12

Employee Tasks Avg TAT On Time
PK

Priya K.

NOC L2 · Mumbai-1

63

52m

96%

RS

Rajesh S.

Sr. HVAC Tech · Mumbai-1

71

1h 08m

89%

AM

Amit M.

Electrical Tech · Mumbai-1

48

2h 41m

64%

VR

Vijay R.

Technician, Maintenance

38

1h 19m

84%

Template Library

Compliance procedures, ready on day one

Every RakuOps deployment ships with facility checklists for cooling, power, fire, NOC handover, and compliance, aligned with Uptime Institute and TIA-942 best practice and tuned to your SOPs.

All Fire & Safety Cooling Electrical NOC & Operations Security & Access
⚙️
CRAC Weekly PM
12 steps · Cooling
Use Template
🛡️
Cage Access Audit
8 steps · Security
Use Template
🔄
PDU Failover Drill
14 steps · Electrical
Use Template
🧲
Fire Panel Monthly Check
9 steps · Fire & Safety
Use Template
📋
NOC Shift Handover
6 steps · NOC Operations
Use Template
👷
Engineer Onboarding
10 steps · HR & Compliance
Use Template
🔧
UPS Quarterly Load Test
11 steps · Electrical
Use Template
Build your own
Start from scratch
WHO IT'S FOR

Built for the Indian data center landscape

Deployed across commercial colocation, BFSI captive sites, telco edge, and corporate server rooms. Mid-market today, with growing references in Tier-3 colos.

Commercial Colocation

BFSI Captive DCs

Telco Edge Sites

Corporate Server Rooms

Healthcare & Pharma

SaaS & Cloud Edge

New build, retrofit, or replacing a legacy BMS?   Book a site walk →

RakuOps DCM · Cage Drill-Down Live

CRAC Unit A-2

Plant Room · HVAC

● Running
Cooling efficiency 94%

Supply temp

22.4°C

Power

18.6 kW

PDU B-04

Power Room · Electrical

● Alert
Breaker load 88%

Current

38.6 kW

Headroom

▼ 12%

AI Anomaly Detected

PDU B-04 trending past 85% breaker load. Will cross failover threshold in approximately 38 minutes at current draw. Recommend redistribution.

View Sensor Log Raise Work Order
CRAC Unit A-2: Power draw (last 8h) kW
8h ago Now
RAKUOPS DCM

Drill into any rack, CRAC, PDU, or UPS in one click

Every sensor we install streams into RakuOps. The moment a reading crosses a threshold or pattern, the AI flags it, attaches recent history, and opens a ticket for the right team.

Live PUE & per-rack telemetry

Cooling efficiency, supply/return temps, humidity, load, updated every minute.

AI anomaly detection

Catches load creep, thermal drift, leak pings, and access anomalies before they become outages.

End-to-end installation

Site survey, sensor supply, cabling, panel integration, and commissioning, all from one team.

One-time setup · Monthly per-site pricing

VISIBILITY

Everything happening across your team, in one view.

Open tasks, overdue work, employee completion rates, and scheduled runs, all on one screen without having to ask anyone.

RakuOps: Operations Dashboard
Open Tasks
14
3 overdue
Completed Today
27
↑ 4 from yesterday
Checklists Run
8
1 missed
Avg. TAT Today
1h 42m
Target: < 2h

Active & Overdue

CRAC C-2: Filter Pressure Check
IN PROGRESS
Safety Gate Sensor Test, Line 3
OVERDUE
Fire Suppression Test, Cage B
ASSIGNED
Shift Handover, Line 2 Supervisor
OVERDUE
Morning Startup Checklist, Line 1
DONE

Employee TAT

RS
Anil V. (HVAC)
1h 15m
PK
Priya K.
1h 58m
AM
Amit M.
3h 10m
SK
Sunil K.
0h 55m
PRICING

Bundled pricing, fixed scope, no surprises

Every engagement starts with a site walk. We scope your facility, send a fixed-scope proposal in 5 working days, then deploy in 4 to 6 weeks. Pricing scales with your site, not your seat count.

Edge
From ₹3.5L

setup · single site · up to 25 racks

  • Site survey & sensor scoping
  • Rack inlet temp, humidity, leak, smoke
  • CRAC, PDU, UPS telemetry
  • RakuOps software for 1 site
  • Install, commissioning & training
  • + ₹15K / month SaaS
Most Popular
Mid-Market
From ₹9L

setup · single site · 25 to 120 racks

  • Everything in Edge
  • Full BMS coverage (HVAC, fire, access, lighting)
  • Live PUE & SLA dashboards
  • AI anomaly detection & auto-ticketing
  • Standard SLA: 24x7 NOC support
  • + ₹35K / month SaaS
Enterprise
Custom

multi-site · Tier-3+ · 120+ racks

  • Everything in Mid-Market
  • Multi-site rollout & central dashboard
  • Integrations: existing BMS, ITSM, SNMP
  • Uptime Institute & TIA-942 alignment
  • Premium SLA, dedicated CSM, on-call engineer

All deployments include a free site walk and fixed-scope proposal. Quoted setup is one-time; SaaS billed monthly.

* Hardware count and exact quote depend on site survey. Cooling, power, fire, leak, and access sensors are bundled. AMC available year 2 onward.

Get started

See your facility on RakuOps in 4 to 6 weeks.

We survey your site, install BMS plus DCM sensors across cooling, power, fire, leak, and access, and bring it live with one unified dashboard, one ticketing flow, one team to call.

Mumbai · Bengaluru · Hyderabad · Chennai · NCR. Fixed-scope proposal in 5 working days.

RakuOps

Unified BMS + DCM for Indian data centers